Requirement record
Organize load, span, lift, duty and environmental inputs in one opportunity context.
Product capabilities
Cranelume connects the work that happens between an incoming crane requirement and a reviewable commercial draft. Each layer stays explicit, inspectable and owned by people.
01 / Understand
Capture the operating context that gives a calculation meaning, rather than reducing an opportunity to a single capacity field.
Organize load, span, lift, duty and environmental inputs in one opportunity context.
Mark unknowns and preliminary assumptions so reviewers know where confirmation is still required.
Keep changes tied to the draft instead of losing decisions across disconnected files.
02 / Engineer
Calculation functions produce numeric outputs from explicit inputs. Generative assistance may explain or navigate, but it does not invent engineering values.
Support early-stage engineering checks that help a bid team frame a feasible concept.
Expose inputs, outputs and warnings for technical review.
Keep pre-engineering separate from project-specific verification and production release.
03 / Compose
Group provisional crane components into a quote-oriented structure.
Connect quantities and catalogue choices without hiding the source or currency basis.
Present options as reviewable choices, not silent substitutions.
04 / Govern
Keep preliminary outputs visibly marked until an authorized review is complete.
See what changed between quotation iterations and preserve decision context.
Record the human review point instead of implying automated production approval.
PILOT / NEXT STEP